How long does an EMM repair take?
Most repairs are done within 1–2 weeks of the module arriving. On top of that comes shipping both ways and, from outside the EU, customs. Pick where you ship from and which module you have.
Shipping from
Your module
Door to door, repair included, about
11–20 business days
Of which 1–2 weeks under repair. Of which 2½–3½ weeks under repair.
- DHL to us
- 3–5
- Under repair
- 5–10
- DHL back
- 3–5
Business days per stage, pickup and customs included.
We book the DHL pickup and do the customs papers. No customs inside the EU.
Send us your EMMDoor to door, step by step
Shipping from somewhere else? Transit times and customs by country
-
1
Shipping to us
DHL Express on our account, 2–3 business days. We book the pickup at your address.
-
2
Customs
We prepare the papers and declare the module as a repair rather than a sale. Wrong paperwork is the usual reason a module sits at customs, which is why non-EU shipments go on our DHL account.
-
3
Under repair
Diagnosis on the test bench, the repair, then re-sealing. Most modules are done within 1–2 weeks.
With the current queue: E-TEC 1–2 weeks, Ficht 2½–3½ weeks.
-
4
Invoice
When the repair is finished we send the invoice. The module ships once it is paid.
-
5
Shipping back
DHL Express with tracking, 2–3 business days.
From the US, shipping both ways takes roughly 6–10 business days, pickup and customs included.
What can make it take longer
A fault we have to chase, or a part we have to wait for, can add one to three weeks. The usual causes:
An unknown or second fault.
If you are not sure what is wrong, or diagnosis turns up more than the reported fault, the repair takes longer. You hear from us once the module has been on the test bench.
Ficht battery faults.
A bad battery or charging fault can damage a Ficht EMM beyond repair. We then have to find a replacement module.
Waiting on a part.
Common components are on the shelf, but a rare one can mean a wait.
A long queue.
When the workshop is busy we add a week to our quoted times. The figures on this page and on the submit form already include it.
Why it is faster than it used to be
Turnaround used to depend on which parts and how much bench space we had. These are the changes that brought it down.
-
2018
The first repair
A 75 HP died on a blown fuse. We opened the EMM, repaired it, and then found owners everywhere stuck with the same fault and nowhere to send it.
-
2019–2023
A proper workshop
The spare-time project got its own office, test gear and parts on the shelf. Modules started coming in from the rest of Europe, then from further afield.
-
2024
The part we could not buy
One component could no longer be bought anywhere, and repairs that needed it stalled for weeks while we hunted for donor EMMs. We reverse-engineered it and now make our own. A customer ran ours on one engine of a twin 225 E-TEC, with a factory BRP module on the other, and pushed both hard. Ours held up.
-
2025
The move
We moved to a bigger workshop. The building work ran months over and the tools stayed boxed up longer than planned, but the bench is now laid out for the way we repair.
-
2025–2026
Test bench and sealing
We built our own test bench, which runs an EMM under load and finds the fault in minutes, and rebuilt the vulcanizing process we use to re-seal the board.